Versions & rollback
Every approved edit writes an immutable version snapshot. Supervisors can propose a rollback to any prior version — itself a reviewable edit.
| Asset | Ver | Label | Effective | By | Current | Action |
|---|---|---|---|---|---|---|
| PED-WAT-032 | v5 | v5 — GPS correction back to surveyed position (current) | Jul 13, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-WAT-018 | v4 | v4 — Owner of record reassigned (current) | Jul 13, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-TEL-030 | v3 | v3 — Owner of record reassigned (current) | Jul 12, 2026, 10:40 AM | Dana Reynolds | Current | |
| SPL-WAT-014 | v6 | v6 — Splice added via governed edit (current) | Jul 12, 2026, 9:15 AM | Omar Haddad | Current | |
| PP-PONT-03 | v3 | v3 — OCIT expansion (current) | Jul 12, 2026, 9:15 AM | Dana Reynolds | Current | |
| HH-PONT-019 | v4 | v4 — Conduit entry re-mapped (current) | Jul 12, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-I75-024 | v5 | v5 — Owner correction back to OCIT (current) | Jul 11, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-PONT-021 | v3 | v3 — Fusion count updated after service turn-ups (current) | Jul 10, 2026, 9:15 AM | Marcus Thompson | Current | |
| TE-OCIT-DC1 | v4 | v4 — Coordinate corrected from GPS re-survey (current) | Jul 9, 2026, 9:15 AM | Marcus Thompson | Current | |
| PNL-OCIT-DC1-01 | v5 | v5 — Port utilization updated after circuit turn-ups (current) | Jul 9, 2026, 9:15 AM | Priya Natarajan | Current | |
| PED-AUB-42 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jul 8, 2026, 9:15 AM | Marcus Thompson | Current | |
| SPL-I75-043 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Jul 8, 2026, 9:15 AM | Alex Voss | Current | |
| TE-PONT-01 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | Jul 6, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-TROY-003 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Jul 6, 2026, 9:15 AM | Alex Voss | Current | |
| SPL-CAMP-047 | v1 | v1 — Documented from the legacy county route map (current) | Jul 5, 2026, 9:15 AM | Alex Voss | Current | |
| HH-WAT-014 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jul 4, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-PONT-051 | v2 | v2 — Owner of record reassigned (current) | Jul 3, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-I75-005 | v2 | v2 — Owner of record reassigned (current) | Jul 3, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-CAMP-039 | v3 | v3 — Owner of record reassigned (current) | Jun 28, 2026, 9:15 AM | Omar Haddad | Current | |
| SPL-WAT-042 | v3 | v3 — Fusion count updated after service turn-ups (current) | Jun 28, 2026, 9:15 AM | Marcus Thompson | Current | |
| MH-PONT-03 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 27, 2026, 9:15 AM | Marcus Thompson | Current | |
| TE-AUB-006 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Jun 27, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-CAMP-010 | v2 | v2 — Owner of record reassigned (current) | Jun 27, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-WAT-020 | v3 | v3 — Owner of record reassigned (current) | Jun 27, 2026, 9:15 AM | Omar Haddad | Current | |
| TE-AUB-06 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 26, 2026, 9:15 AM | Grace Liu | Current | |
| MH-CAMP-033 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 26, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-AUB-020 | v3 | v3 — Owner of record reassigned (current) | Jun 26, 2026, 9:15 AM | Omar Haddad | Current | |
| PNL-AUB-05 | v2 | v2 — Port utilization updated after circuit turn-ups (current) | Jun 26, 2026, 9:15 AM | Priya Natarajan | Current | |
| PED-TROY-043 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 23, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-WAT-014 | v5 | v5 — Trace re-termination | Jun 22, 2026, 9:15 AM | Dana Reynolds | ||
| PP-PONT-03 | v2 | v2 — Courthouse circuits added | Jun 22, 2026, 9:15 AM | Omar Haddad | ||
| HH-PONT-019 | v3 | v3 — Re-survey after road widening | Jun 22, 2026, 9:15 AM | Dana Reynolds | ||
| MH-PONT-14 | v1 | v1 — Documented from the legacy county route map (current) | Jun 22, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-I75-040 | v3 | v3 — Owner of record reassigned (current) | Jun 22, 2026, 9:15 AM | Omar Haddad | Current | |
| SPL-PONT-014 | v2 | v2 — Fusion count updated after service turn-ups (current) | Jun 22, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-PONT-033 | v1 | v1 — Documented from the legacy county route map (current) | Jun 19, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-PONT-014 | v4 | v4 — Owner of record reassigned (current) | Jun 18, 2026, 9:15 AM | Omar Haddad | Current | |
| PED-WAT-032 | v4 | v4 — Field re-stake 25 ft NE (later corrected) | Jun 15, 2026, 9:15 AM | Omar Haddad | ||
| CAB-I75-026 | v3 | v3 — Owner of record reassigned (current) | Jun 14, 2026, 9:15 AM | Dana Reynolds | Current | |
| PNL-CAMP-07 | v4 | v4 — Port utilization updated after circuit turn-ups (current) | Jun 14, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-WAT-018 | v3 | v3 — Fiber count corrected against the splice sheet | Jun 13, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-051 | v4 | v4 — Owner of record reassigned (current) | Jun 12, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-I75-024 | v4 | v4 — Owner reassigned to Shared Services | Jun 11, 2026, 9:15 AM | Dana Reynolds | ||
| HH-TROY-021 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Jun 11, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-TROY-012 | v2 | v2 — Owner of record reassigned (current) | Jun 11, 2026, 9:15 AM | Grace Liu | Current | |
| SPL-TROY-033 | v2 | v2 — Fusion count updated after service turn-ups (current) | Jun 11, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-WAT-043 | v2 | v2 — Owner of record reassigned (current) | Jun 10, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-I75-044 | v2 | v2 — Fusion count updated after service turn-ups (current) | Jun 10, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-TROY-007 | v2 | v2 — Owner of record reassigned (current) | Jun 8, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-TROY-046 | v2 | v2 — Owner of record reassigned (current) | Jun 8, 2026, 9:15 AM | Priya Natarajan | Current | |
| HH-TROY-030 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 7, 2026, 9:15 AM | Priya Natarajan | Current | |
| TE-OCIT-DC1 | v3 | v3 — Owner of record reassigned | Jun 6, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-CAMP-038 | v3 | v3 — Owner of record reassigned (current) | Jun 5, 2026, 9:15 AM | Dana Reynolds | Current | |
| PNL-AUB-08 | v3 | v3 — Port utilization updated after circuit turn-ups (current) | Jun 5, 2026, 9:15 AM | Marcus Thompson | Current | |
| PED-TEL-051 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Jun 4, 2026, 9:15 AM | Grace Liu | Current | |
| SPL-WAT-014 | v4 | v4 — OCIT service turn-ups | Jun 2, 2026, 9:15 AM | Omar Haddad | ||
| PP-PONT-03 | v1 | v1 — Panel commissioned | Jun 2, 2026, 9:15 AM | Omar Haddad | ||
| HH-PONT-019 | v2 | v2 — GPS correction | Jun 2, 2026, 9:15 AM | Omar Haddad | ||
| CAB-TROY-004 | v4 | v4 — Owner of record reassigned (current) | Jun 2, 2026, 9:15 AM | Dana Reynolds | Current | |
| PNL-AUB-05 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jun 2, 2026, 9:15 AM | Alex Voss | ||
| MH-PONT-03 | v1 | v1 — Documented from the legacy county route map | Jun 1, 2026, 9:15 AM | Alex Voss | ||
| CAB-I75-032 | v4 | v4 — Owner of record reassigned (current) | Jun 1, 2026, 9:15 AM | Marcus Thompson | Current | |
| SPL-CAMP-045 | v4 | v4 — Fusion count updated after service turn-ups (current) | Jun 1, 2026, 9:15 AM | Omar Haddad | Current | |
| HH-WAT-021 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | May 31, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-WAT-031 | v4 | v4 — Owner of record reassigned (current) | May 30, 2026, 9:15 AM | Priya Natarajan | Current | |
| TE-PONT-01 | v2 | v2 — Owner of record reassigned | May 29, 2026, 9:15 AM | Dana Reynolds | ||
| PED-TROY-043 | v1 | v1 — Captured from the Fenix Survey field packet | May 29, 2026, 9:15 AM | Tara Nowak | ||
| HH-I75-027 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | May 28, 2026, 9:15 AM | Marcus Thompson | Current | |
| PED-TROY-042 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | May 28, 2026, 9:15 AM | Dana Reynolds | Current | |
| PED-AUB-044 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | May 27, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-CAMP-044 | v2 | v2 — Owner of record reassigned (current) | May 27, 2026, 9:15 AM | Omar Haddad | Current | |
| SPL-WAT-042 | v2 | v2 — Owner of record reassigned | May 27, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-TROY-030 | v4 | v4 — Owner of record reassigned (current) | May 26, 2026, 9:15 AM | Priya Natarajan | Current | |
| PNL-OCIT-DC1-01 | v4 | v4 — Owner of record reassigned | May 26, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-CAMP-028 | v2 | v2 — Owner of record reassigned (current) | May 25, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-AUB-020 | v2 | v2 — Fiber count corrected against the splice sheet | May 24, 2026, 9:15 AM | Dana Reynolds | ||
| SPL-CAMP-033 | v3 | v3 — Fusion count updated after service turn-ups (current) | May 24, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-TROY-029 | v3 | v3 — Owner of record reassigned (current) | May 20, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-I75-026 | v2 | v2 — Fiber count corrected against the splice sheet | May 19, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-WAT-047 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | May 18, 2026, 9:15 AM | Alex Voss | Current | |
| SPL-TROY-033 | v1 | v1 — Documented from the legacy county route map | May 18, 2026, 9:15 AM | Alex Voss | ||
| SPL-PONT-014 | v1 | v1 — Documented from the legacy county route map | May 17, 2026, 9:15 AM | Alex Voss | ||
| HH-I75-028 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | May 16, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-WAT-049 | v1 | v1 — Documented from the legacy county route map (current) | May 16, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-TROY-007 | v1 | v1 — Migrated from the contractor as-built KMZ package | May 15, 2026, 9:15 AM | Alex Voss | ||
| CAB-WAT-018 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | May 14, 2026, 9:15 AM | Grace Liu | ||
| CAB-WAT-052 | v3 | v3 — Owner of record reassigned (current) | May 14, 2026, 9:15 AM | Omar Haddad | Current | |
| SPL-AUB-039 | v3 | v3 — Fusion count updated after service turn-ups (current) | May 14, 2026, 9:15 AM | Grace Liu | Current | |
| SPL-WAT-014 | v3 | v3 — Upgraded to 96F dome, 4 trays | May 13, 2026, 9:15 AM | Omar Haddad | ||
| HH-PONT-019 | v1 | v1 — As-built import | May 13, 2026, 9:15 AM | Dana Reynolds | ||
| HH-TEL-050 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover (current) | May 13, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-PONT-035 | v4 | v4 — Owner of record reassigned (current) | May 13, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-I75-040 | v2 | v2 — Fiber count corrected against the splice sheet | May 13, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-I75-036 | v2 | v2 — Owner of record reassigned (current) | May 12, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-WAT-036 | v2 | v2 — Fusion count updated after service turn-ups (current) | May 12, 2026, 9:15 AM | Omar Haddad | Current | |
| HH-TROY-029 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | May 11, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-WAT-055 | v3 | v3 — Owner of record reassigned (current) | May 10, 2026, 9:15 AM | Priya Natarajan | Current | |
| PNL-PONT-10 | v1 | v1 — Captured from the Fenix Survey field packet (current) | May 10, 2026, 9:15 AM | Tara Nowak | Current | |
| CAB-CAMP-050 | v4 | v4 — Owner of record reassigned (current) | May 9, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-TROY-037 | v3 | v3 — Fusion count updated after service turn-ups (current) | May 9, 2026, 9:15 AM | Omar Haddad | Current | |
| HH-WAT-024 | v1 | v1 — Captured from the Fenix Survey field packet (current) | May 8, 2026, 9:15 AM | Tara Nowak | Current | |
| HH-WAT-023 | v1 | v1 — Documented from the legacy county route map (current) | May 7, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-AUB-015 | v2 | v2 — Owner of record reassigned (current) | May 7, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-CAMP-034 | v2 | v2 — Owner of record reassigned (current) | May 7, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-PONT-021 | v2 | v2 — Owner of record reassigned | May 7, 2026, 9:15 AM | Priya Natarajan | ||
| PNL-CAMP-06 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | May 6, 2026, 9:15 AM | Alex Voss | Current | |
| TE-OCIT-DC1 | v2 | v2 — Address normalized against the county centerline file | May 4, 2026, 9:15 AM | Dana Reynolds | ||
| PED-WAT-032 | v3 | v3 — GPS re-survey | May 1, 2026, 9:15 AM | Dana Reynolds | ||
| PED-AUB-42 | v1 | v1 — Migrated from the contractor as-built KMZ package | May 1, 2026, 9:15 AM | Alex Voss | ||
| CAB-WAT-020 | v2 | v2 — Fiber count corrected against the splice sheet | May 1, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-WAT-043 | v1 | v1 — Migrated from the contractor as-built KMZ package | Apr 29, 2026, 9:15 AM | Alex Voss | ||
| CAB-I75-024 | v3 | v3 — Splice re-termination at SPL-WAT-014 | Apr 28, 2026, 9:15 AM | Omar Haddad | ||
| SPL-CAMP-045 | v3 | v3 — Owner of record reassigned | Apr 28, 2026, 9:15 AM | Grace Liu | ||
| SPL-TROY-035 | v4 | v4 — Fusion count updated after service turn-ups (current) | Apr 27, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-WAT-046 | v4 | v4 — Fusion count updated after service turn-ups (current) | Apr 26, 2026, 9:15 AM | Marcus Thompson | Current | |
| HH-I75-027 | v2 | v2 — Owner of record reassigned | Apr 25, 2026, 9:15 AM | Grace Liu | ||
| SPL-WAT-042 | v1 | v1 — Documented from the legacy county route map | Apr 25, 2026, 9:15 AM | Alex Voss | ||
| MH-CAMP-033 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 24, 2026, 9:15 AM | Tara Nowak | ||
| SPL-WAT-014 | v2 | v2 — Waterford laterals spliced in | Apr 23, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-I75-026 | v1 | v1 — Documented from the legacy county route map | Apr 23, 2026, 9:15 AM | Alex Voss | ||
| CAB-PONT-016 | v2 | v2 — Owner of record reassigned (current) | Apr 22, 2026, 9:15 AM | Omar Haddad | Current | |
| TE-PONT-01 | v1 | v1 — Documented from the legacy county route map | Apr 21, 2026, 9:15 AM | Alex Voss | ||
| HH-WAT-014 | v1 | v1 — Migrated from the contractor as-built KMZ package | Apr 21, 2026, 9:15 AM | Alex Voss | ||
| CAB-AUB-020 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 21, 2026, 9:15 AM | Tara Nowak | ||
| CAB-TROY-024 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover (current) | Apr 21, 2026, 9:15 AM | Alex Voss | Current | |
| SPL-CAMP-038 | v3 | v3 — Fusion count updated after service turn-ups (current) | Apr 21, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-AUB-040 | v3 | v3 — Fusion count updated after service turn-ups (current) | Apr 20, 2026, 9:15 AM | Dana Reynolds | Current | |
| MH-AUB-032 | v1 | v1 — Captured from the Fenix Survey field packet (current) | Apr 18, 2026, 9:15 AM | Tara Nowak | Current | |
| SPL-WAT-041 | v2 | v2 — Fusion count updated after service turn-ups (current) | Apr 17, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-AUB-011 | v2 | v2 — Owner of record reassigned (current) | Apr 16, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-CAMP-053 | v3 | v3 — Owner of record reassigned (current) | Apr 16, 2026, 9:15 AM | Grace Liu | Current | |
| HH-WAT-021 | v2 | v2 — Owner of record reassigned | Apr 15, 2026, 9:15 AM | Grace Liu | ||
| CAB-WAT-017 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover (current) | Apr 15, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-TEL-030 | v2 | v2 — Fiber count corrected against the splice sheet | Apr 14, 2026, 10:40 AM | Priya Natarajan | ||
| CAB-WAT-018 | v1 | v1 — Migrated from the contractor as-built KMZ package | Apr 14, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-010 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 13, 2026, 9:15 AM | Tara Nowak | ||
| CAB-PONT-051 | v1 | v1 — Documented from the legacy county route map | Apr 12, 2026, 9:15 AM | Alex Voss | ||
| PNL-OCIT-DC1-01 | v3 | v3 — Card added — port count increased | Apr 12, 2026, 9:15 AM | Omar Haddad | ||
| CAB-I75-037 | v2 | v2 — Owner of record reassigned (current) | Apr 11, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-WAT-055 | v2 | v2 — Fiber count corrected against the splice sheet | Apr 11, 2026, 9:15 AM | Marcus Thompson | ||
| MH-AUB-031 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Apr 10, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-TROY-006 | v3 | v3 — Owner of record reassigned (current) | Apr 10, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-AUB-015 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 10, 2026, 9:15 AM | Tara Nowak | ||
| CAB-TROY-018 | v4 | v4 — Owner of record reassigned (current) | Apr 10, 2026, 9:15 AM | Dana Reynolds | Current | |
| PNL-AUB-08 | v2 | v2 — Owner of record reassigned | Apr 9, 2026, 9:15 AM | Grace Liu | ||
| CAB-WAT-008 | v2 | v2 — Owner of record reassigned (current) | Apr 8, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-TROY-051 | v3 | v3 — Fiber count corrected against the splice sheet | Apr 8, 2026, 9:15 AM | Omar Haddad | ||
| CAB-I75-036 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Apr 7, 2026, 9:15 AM | Alex Voss | ||
| HH-TROY-031 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | Apr 6, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-TROY-004 | v3 | v3 — Fiber count corrected against the splice sheet | Apr 6, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-CAMP-034 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 6, 2026, 9:15 AM | Tara Nowak | ||
| CAB-I75-005 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Apr 5, 2026, 9:15 AM | Alex Voss | ||
| CAB-WAT-031 | v3 | v3 — Fiber count corrected against the splice sheet | Apr 5, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-025 | v4 | v4 — Owner of record reassigned (current) | Apr 4, 2026, 9:15 AM | Marcus Thompson | Current | |
| SPL-WAT-014 | v1 | v1 — Initial dome install (48F) | Apr 3, 2026, 9:15 AM | Dana Reynolds | ||
| HH-WAT-022 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | Apr 3, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-CAMP-039 | v2 | v2 — Fiber count corrected against the splice sheet | Apr 3, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-I75-040 | v1 | v1 — Documented from the legacy county route map | Apr 3, 2026, 9:15 AM | Alex Voss | ||
| HH-I75-028 | v1 | v1 — Migrated from the contractor as-built KMZ package | Apr 2, 2026, 9:15 AM | Alex Voss | ||
| TE-OCIT-DC1 | v1 | v1 — Captured from the Fenix Survey field packet | Apr 1, 2026, 9:15 AM | Tara Nowak | ||
| TE-AUB-06 | v1 | v1 — Documented from the legacy county route map | Apr 1, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-050 | v3 | v3 — Fiber count corrected against the splice sheet | Mar 31, 2026, 9:15 AM | Priya Natarajan | ||
| PNL-AUB-09 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Mar 30, 2026, 9:15 AM | Alex Voss | Current | |
| PED-TEL-051 | v1 | v1 — Captured from the Fenix Survey field packet | Mar 29, 2026, 9:15 AM | Tara Nowak | ||
| PED-I75-046 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | Mar 29, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-TROY-030 | v3 | v3 — Fiber count corrected against the splice sheet | Mar 29, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-046 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 29, 2026, 9:15 AM | Alex Voss | ||
| CAB-I75-048 | v4 | v4 — Owner of record reassigned (current) | Mar 29, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-I75-044 | v1 | v1 — Captured from the Fenix Survey field packet | Mar 29, 2026, 9:15 AM | Tara Nowak | ||
| CAB-PONT-014 | v3 | v3 — Fiber count corrected against the splice sheet | Mar 27, 2026, 9:15 AM | Grace Liu | ||
| SPL-TROY-032 | v2 | v2 — Fusion count updated after service turn-ups (current) | Mar 25, 2026, 9:15 AM | Dana Reynolds | Current | |
| SPL-CAMP-045 | v2 | v2 — Express port added for mid-sheath pass-through | Mar 25, 2026, 9:15 AM | Marcus Thompson | ||
| SPL-WAT-036 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 24, 2026, 9:15 AM | Alex Voss | ||
| HH-I75-025 | v3 | v3 — Coordinate corrected from GPS re-survey (current) | Mar 23, 2026, 9:15 AM | Omar Haddad | Current | |
| HH-I75-026 | v1 | v1 — Documented from the legacy county route map (current) | Mar 23, 2026, 9:15 AM | Alex Voss | Current | |
| HH-I75-027 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 23, 2026, 9:15 AM | Alex Voss | ||
| PED-TROY-041 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover (current) | Mar 23, 2026, 9:15 AM | Alex Voss | Current | |
| MH-CAMP-034 | v1 | v1 — Migrated from the contractor as-built KMZ package (current) | Mar 22, 2026, 9:15 AM | Alex Voss | Current | |
| CAB-CAMP-038 | v2 | v2 — Fiber count corrected against the splice sheet | Mar 22, 2026, 9:15 AM | Priya Natarajan | ||
| SPL-TROY-037 | v2 | v2 — Owner of record reassigned | Mar 20, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-WAT-013 | v2 | v2 — Owner of record reassigned (current) | Mar 19, 2026, 9:15 AM | Grace Liu | Current | |
| PED-I75-045 | v2 | v2 — Coordinate corrected from GPS re-survey (current) | Mar 18, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-I75-037 | v1 | v1 — Documented from the legacy county route map | Mar 18, 2026, 9:15 AM | Alex Voss | ||
| PED-WAT-032 | v2 | v2 — Coordinate correction | Mar 17, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-I75-024 | v2 | v2 — Route attribution corrected | Mar 17, 2026, 9:15 AM | Dana Reynolds | ||
| PNL-CAMP-07 | v3 | v3 — Owner of record reassigned | Mar 17, 2026, 9:15 AM | Priya Natarajan | ||
| HH-TROY-029 | v2 | v2 — Owner of record reassigned | Mar 16, 2026, 9:15 AM | Omar Haddad | ||
| CAB-TROY-012 | v1 | v1 — Documented from the legacy county route map | Mar 15, 2026, 9:15 AM | Alex Voss | ||
| CAB-AUB-045 | v3 | v3 — Owner of record reassigned (current) | Mar 15, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-I75-032 | v3 | v3 — Fiber count corrected against the splice sheet | Mar 14, 2026, 9:15 AM | Grace Liu | ||
| CAB-PONT-056 | v2 | v2 — Owner of record reassigned (current) | Mar 14, 2026, 9:15 AM | Grace Liu | Current | |
| CAB-WAT-052 | v2 | v2 — Fiber count corrected against the splice sheet | Mar 13, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-WAT-055 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 13, 2026, 9:15 AM | Alex Voss | ||
| HH-TROY-030 | v1 | v1 — Documented from the legacy county route map | Mar 11, 2026, 9:15 AM | Alex Voss | ||
| SPL-PONT-034 | v3 | v3 — Fusion count updated after service turn-ups (current) | Mar 11, 2026, 9:15 AM | Priya Natarajan | Current | |
| CAB-CAMP-021 | v1 | v1 — Captured from the Fenix Survey field packet (current) | Mar 10, 2026, 9:15 AM | Tara Nowak | Current | |
| CAB-WAT-019 | v4 | v4 — Owner of record reassigned (current) | Mar 9, 2026, 9:15 AM | Dana Reynolds | Current | |
| CAB-PONT-027 | v2 | v2 — Owner of record reassigned (current) | Mar 9, 2026, 9:15 AM | Priya Natarajan | Current | |
| HH-TROY-031 | v2 | v2 — Owner of record reassigned | Mar 8, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-006 | v2 | v2 — Fiber count corrected against the splice sheet | Mar 6, 2026, 9:15 AM | Dana Reynolds | ||
| PED-TROY-042 | v2 | v2 — Owner of record reassigned | Mar 5, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-WAT-020 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 5, 2026, 9:15 AM | Alex Voss | ||
| SPL-WAT-041 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Mar 5, 2026, 9:15 AM | Alex Voss | ||
| CAB-TROY-002 | v4 | v4 — Owner of record reassigned (current) | Mar 4, 2026, 9:15 AM | Marcus Thompson | Current | |
| SPL-PONT-021 | v1 | v1 — Documented from the legacy county route map | Mar 4, 2026, 9:15 AM | Alex Voss | ||
| CAB-TROY-009 | v2 | v2 — Owner of record reassigned (current) | Mar 2, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-CAMP-028 | v1 | v1 — Migrated from the contractor as-built KMZ package | Mar 2, 2026, 9:15 AM | Alex Voss | ||
| HH-WAT-021 | v1 | v1 — Migrated from the contractor as-built KMZ package | Feb 28, 2026, 9:15 AM | Alex Voss | ||
| PED-AUB-044 | v2 | v2 — Owner of record reassigned | Feb 28, 2026, 9:15 AM | Marcus Thompson | ||
| HH-WAT-022 | v2 | v2 — Owner of record reassigned | Feb 27, 2026, 9:15 AM | Omar Haddad | ||
| SPL-WAT-046 | v3 | v3 — Owner of record reassigned | Feb 27, 2026, 9:15 AM | Priya Natarajan | ||
| PNL-OCIT-DC1-01 | v2 | v2 — Connector style corrected from the panel label | Feb 27, 2026, 9:15 AM | Grace Liu | ||
| CAB-CAMP-023 | v2 | v2 — Owner of record reassigned (current) | Feb 24, 2026, 9:15 AM | Marcus Thompson | Current | |
| CAB-CAMP-044 | v1 | v1 — Documented from the legacy county route map | Feb 24, 2026, 9:15 AM | Alex Voss | ||
| CAB-AUB-011 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Feb 22, 2026, 9:15 AM | Alex Voss | ||
| SPL-CAMP-033 | v2 | v2 — Owner of record reassigned | Feb 22, 2026, 9:15 AM | Omar Haddad | ||
| CAB-WAT-054 | v3 | v3 — Owner of record reassigned (current) | Feb 21, 2026, 9:15 AM | Marcus Thompson | Current | |
| SPL-AUB-040 | v2 | v2 — Owner of record reassigned | Feb 21, 2026, 9:15 AM | Omar Haddad | ||
| PED-I75-045 | v1 | v1 — Documented from the legacy county route map | Feb 20, 2026, 9:15 AM | Alex Voss | ||
| CAB-PONT-016 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Feb 20, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-050 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Feb 20, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-029 | v2 | v2 — Fiber count corrected against the splice sheet | Feb 19, 2026, 9:15 AM | Dana Reynolds | ||
| SPL-CAMP-045 | v1 | v1 — Migrated from the contractor as-built KMZ package | Feb 19, 2026, 9:15 AM | Alex Voss | ||
| CAB-WAT-022 | v4 | v4 — Owner of record reassigned (current) | Feb 18, 2026, 9:15 AM | Priya Natarajan | Current | |
| SPL-TROY-032 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Feb 18, 2026, 9:15 AM | Alex Voss | ||
| CAB-I75-041 | v2 | v2 — Owner of record reassigned (current) | Feb 15, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-CAMP-042 | v4 | v4 — Owner of record reassigned (current) | Feb 15, 2026, 9:15 AM | Omar Haddad | Current | |
| CAB-PONT-056 | v1 | v1 — Captured from the Fenix Survey field packet | Feb 15, 2026, 9:15 AM | Tara Nowak | ||
| SPL-TROY-035 | v3 | v3 — Owner of record reassigned | Feb 14, 2026, 9:15 AM | Priya Natarajan | ||
| SPL-AUB-039 | v2 | v2 — Owner of record reassigned | Feb 13, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-PONT-035 | v3 | v3 — Fiber count corrected against the splice sheet | Feb 12, 2026, 9:15 AM | Priya Natarajan | ||
| PNL-AUB-08 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Feb 11, 2026, 9:15 AM | Alex Voss | ||
| CAB-WAT-031 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Feb 9, 2026, 9:15 AM | Grace Liu | ||
| CAB-TROY-004 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Feb 8, 2026, 9:15 AM | Marcus Thompson | ||
| HH-TROY-031 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Feb 7, 2026, 9:15 AM | Alex Voss | ||
| SPL-CAMP-038 | v2 | v2 — Owner of record reassigned | Feb 4, 2026, 9:15 AM | Omar Haddad | ||
| CAB-CAMP-053 | v2 | v2 — Fiber count corrected against the splice sheet | Feb 3, 2026, 9:15 AM | Omar Haddad | ||
| CAB-TROY-051 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Feb 2, 2026, 9:15 AM | Dana Reynolds | ||
| CAB-TROY-006 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Jan 30, 2026, 9:15 AM | Alex Voss | ||
| CAB-TROY-025 | v3 | v3 — Fiber count corrected against the splice sheet | Jan 30, 2026, 9:15 AM | Grace Liu | ||
| CAB-TROY-030 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Jan 30, 2026, 9:15 AM | Grace Liu | ||
| SPL-TROY-037 | v1 | v1 — Documented from the legacy county route map | Jan 29, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-023 | v1 | v1 — Captured from the Fenix Survey field packet | Jan 26, 2026, 9:15 AM | Tara Nowak | ||
| CAB-WAT-008 | v1 | v1 — Captured from the Fenix Survey field packet | Jan 25, 2026, 9:15 AM | Tara Nowak | ||
| HH-WAT-022 | v1 | v1 — Captured from the Fenix Survey field packet | Jan 23, 2026, 9:15 AM | Tara Nowak | ||
| CAB-I75-024 | v1 | v1 — Migrated from contractor as-built KMZ | Jan 21, 2026, 9:15 AM | Alex Voss | ||
| MH-AUB-031 | v1 | v1 — Documented from the legacy county route map | Jan 20, 2026, 9:15 AM | Alex Voss | ||
| HH-TROY-029 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jan 19, 2026, 9:15 AM | Alex Voss | ||
| CAB-I75-041 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Jan 17, 2026, 9:15 AM | Alex Voss | ||
| CAB-TEL-030 | v1 | v1 — Captured from the Fenix Survey field packet | Jan 15, 2026, 10:40 AM | Tara Nowak | ||
| CAB-WAT-022 | v3 | v3 — Fiber count corrected against the splice sheet | Jan 14, 2026, 9:15 AM | Marcus Thompson | ||
| PNL-OCIT-DC1-01 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jan 14, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-050 | v1 | v1 — Captured from the Fenix Survey field packet | Jan 12, 2026, 9:15 AM | Tara Nowak | ||
| CAB-WAT-054 | v2 | v2 — Fiber count corrected against the splice sheet | Jan 12, 2026, 9:15 AM | Grace Liu | ||
| CAB-WAT-052 | v1 | v1 — Documented from the legacy county route map | Jan 10, 2026, 9:15 AM | Alex Voss | ||
| CAB-PONT-027 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Jan 9, 2026, 9:15 AM | Alex Voss | ||
| CAB-TROY-018 | v3 | v3 — Fiber count corrected against the splice sheet | Jan 8, 2026, 9:15 AM | Priya Natarajan | ||
| CAB-CAMP-039 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jan 7, 2026, 9:15 AM | Alex Voss | ||
| PED-WAT-032 | v1 | v1 — Migrated from contractor KMZ | Jan 6, 2026, 9:15 AM | Alex Voss | ||
| CAB-CAMP-038 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Jan 6, 2026, 9:15 AM | Alex Voss | ||
| CAB-AUB-045 | v2 | v2 — Fiber count corrected against the splice sheet | Jan 4, 2026, 9:15 AM | Grace Liu | ||
| PED-I75-046 | v2 | v2 — Owner of record reassigned | Jan 3, 2026, 9:15 AM | Marcus Thompson | ||
| CAB-PONT-014 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Jan 3, 2026, 9:15 AM | Marcus Thompson | ||
| HH-I75-025 | v2 | v2 — Owner of record reassigned | Jan 1, 2026, 9:15 AM | Dana Reynolds | ||
| SPL-WAT-046 | v2 | v2 — Express port added for mid-sheath pass-through | Dec 31, 2025, 9:15 AM | Dana Reynolds | ||
| CAB-I75-048 | v3 | v3 — Fiber count corrected against the splice sheet | Dec 27, 2025, 9:15 AM | Priya Natarajan | ||
| CAB-I75-032 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Dec 25, 2025, 9:15 AM | Omar Haddad | ||
| SPL-AUB-040 | v1 | v1 — Migrated from the contractor as-built KMZ package | Dec 25, 2025, 9:15 AM | Alex Voss | ||
| CAB-WAT-013 | v1 | v1 — Captured from the Fenix Survey field packet | Dec 24, 2025, 9:15 AM | Tara Nowak | ||
| CAB-TROY-009 | v1 | v1 — Documented from the legacy county route map | Dec 20, 2025, 9:15 AM | Alex Voss | ||
| PNL-CAMP-07 | v2 | v2 — Card added — port count increased | Dec 18, 2025, 9:15 AM | Marcus Thompson | ||
| CAB-WAT-031 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Dec 16, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-002 | v3 | v3 — Fiber count corrected against the splice sheet | Dec 15, 2025, 9:15 AM | Grace Liu | ||
| CAB-TROY-004 | v1 | v1 — Captured from the Fenix Survey field packet | Dec 13, 2025, 9:15 AM | Tara Nowak | ||
| SPL-PONT-034 | v2 | v2 — Owner of record reassigned | Dec 13, 2025, 9:15 AM | Dana Reynolds | ||
| PED-TROY-042 | v1 | v1 — Migrated from the contractor as-built KMZ package | Dec 11, 2025, 9:15 AM | Alex Voss | ||
| CAB-WAT-019 | v3 | v3 — Fiber count corrected against the splice sheet | Dec 10, 2025, 9:15 AM | Priya Natarajan | ||
| CAB-WAT-022 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Dec 10, 2025, 9:15 AM | Grace Liu | ||
| CAB-CAMP-042 | v3 | v3 — Fiber count corrected against the splice sheet | Dec 7, 2025, 9:15 AM | Dana Reynolds | ||
| SPL-TROY-035 | v2 | v2 — Express port added for mid-sheath pass-through | Dec 4, 2025, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-030 | v1 | v1 — Documented from the legacy county route map | Dec 3, 2025, 9:15 AM | Alex Voss | ||
| CAB-WAT-054 | v1 | v1 — Migrated from the contractor as-built KMZ package | Dec 3, 2025, 9:15 AM | Alex Voss | ||
| PED-AUB-044 | v1 | v1 — Migrated from the contractor as-built KMZ package | Dec 2, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-051 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Nov 29, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-025 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Nov 27, 2025, 9:15 AM | Omar Haddad | ||
| CAB-CAMP-053 | v1 | v1 — Migrated from the contractor as-built KMZ package | Nov 23, 2025, 9:15 AM | Alex Voss | ||
| SPL-CAMP-033 | v1 | v1 — Captured from the Fenix Survey field packet | Nov 23, 2025, 9:15 AM | Tara Nowak | ||
| CAB-TROY-029 | v1 | v1 — Migrated from the contractor as-built KMZ package | Nov 21, 2025, 9:15 AM | Alex Voss | ||
| SPL-CAMP-038 | v1 | v1 — Migrated from the contractor as-built KMZ package | Nov 20, 2025, 9:15 AM | Alex Voss | ||
| SPL-AUB-039 | v1 | v1 — Documented from the legacy county route map | Nov 15, 2025, 9:15 AM | Alex Voss | ||
| CAB-PONT-035 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Nov 14, 2025, 9:15 AM | Dana Reynolds | ||
| CAB-WAT-022 | v1 | v1 — Captured from the Fenix Survey field packet | Nov 5, 2025, 9:15 AM | Tara Nowak | ||
| SPL-WAT-046 | v1 | v1 — Documented from the legacy county route map | Nov 3, 2025, 9:15 AM | Alex Voss | ||
| CAB-AUB-045 | v1 | v1 — Documented from the legacy county route map | Oct 26, 2025, 9:15 AM | Alex Voss | ||
| HH-I75-025 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Oct 12, 2025, 9:15 AM | Alex Voss | ||
| CAB-PONT-014 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Oct 12, 2025, 9:15 AM | Alex Voss | ||
| PED-I75-046 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Oct 10, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-018 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Oct 8, 2025, 9:15 AM | Marcus Thompson | ||
| CAB-I75-032 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Oct 7, 2025, 9:15 AM | Alex Voss | ||
| CAB-CAMP-042 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Sep 28, 2025, 9:15 AM | Priya Natarajan | ||
| CAB-TROY-002 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Sep 27, 2025, 9:15 AM | Omar Haddad | ||
| CAB-I75-048 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Sep 26, 2025, 9:15 AM | Marcus Thompson | ||
| CAB-TROY-025 | v1 | v1 — Migrated from the contractor as-built KMZ package | Sep 24, 2025, 9:15 AM | Alex Voss | ||
| SPL-TROY-035 | v1 | v1 — Migrated from the contractor as-built KMZ package | Sep 23, 2025, 9:15 AM | Alex Voss | ||
| PNL-CAMP-07 | v1 | v1 — Captured from the Fenix Survey field packet | Sep 20, 2025, 9:15 AM | Tara Nowak | ||
| SPL-PONT-034 | v1 | v1 — Migrated from the contractor as-built KMZ package | Sep 16, 2025, 9:15 AM | Alex Voss | ||
| CAB-WAT-019 | v2 | v2 — Recorded length re-sourced to routed geometry + slack allowance | Sep 12, 2025, 9:15 AM | Marcus Thompson | ||
| CAB-PONT-035 | v1 | v1 — Migrated from the contractor as-built KMZ package | Aug 16, 2025, 9:15 AM | Alex Voss | ||
| CAB-CAMP-042 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jul 20, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-002 | v1 | v1 — Loaded in the oakland_baseline.gdb baseline cutover | Jul 10, 2025, 9:15 AM | Alex Voss | ||
| CAB-TROY-018 | v1 | v1 — Migrated from the contractor as-built KMZ package | Jul 8, 2025, 9:15 AM | Alex Voss | ||
| CAB-I75-048 | v1 | v1 — Documented from the legacy county route map | Jun 26, 2025, 9:15 AM | Alex Voss | ||
| CAB-WAT-019 | v1 | v1 — Captured from the Fenix Survey field packet | Jun 15, 2025, 9:15 AM | Tara Nowak |